Skip to Main Content
Let's Talk
Menu Close

An Energy Optimization Project for Multi-Purpose NBA Stadium

An Energy Optimization Project for Multi-Purpose NBA Stadium

Published
18 March 2020

An Energy Optimization Project for Multi-Purpose NBA Stadium

This case study covers a successful energy optimization project at a 586,000-square-foot, multi-purpose arena in Oklahoma City, managed by ASM Global and owned by the city. It opened in 2002 as part of the city’s MAPS initiative. The project aimed to maximize efficiency through targeted HVAC system improvements.

Read the Full Overview

Case Study: Georgia Tech

Case Study: Georgia Tech

Published
01 March 2020

Georgia Institute of Technology: HVAC optimization reaps savings and insights into daily plant operations

The Georgia Institute of Technology received permission from the state of Georgia to enter into a Guaranteed Energy Savings Performance Contract (GESPC) and receive a $7.7 million loan to tackle any energy and water conservation project it wanted—as long as the project could pay for itself within seven years. Donald P. Alexander, P.E., Georgia Tech’s facilities design and construction Institute engineer, and his project team, Greg Spiro, P.E., senior mechanical design engineer, and Ben Mason, associate director of energy, determined that the funding would make the greatest impact spent on improving the efficiency of the university’s two chiller plants…

Click to Read Full Case Study